Skip to main content
Wattproof

Solar panels in Northern Ireland: yield and payback

By Wattproof Editorial Team. Last reviewed 7 October 2026. Figures and schemes change — verify with an MCS-certified installer before you commit.

We calculated the yield for 2 Northern Ireland counties with PVGIS, the European Commission's solar tool, and ran each through the calculator for a typical 4.4 kWp system.

CountyPVGIS, unscaledUsed (kWh/kWp)4.4 kWp makesPayback
County Down944.79174,035 kWh22.4 yrs
County Antrim862.38373,683 kWh22.8 yrs

How the counties compare

The sunniest Northern Ireland county we cover is County Down, at 917 kWh per kWp a year. The least sunny is County Antrim, at 837, so a system makes about 10% more in County Down. Against all 25 counties we cover, they rank from 17th to 23rd for sunshine. PVGIS puts 70% to 71% of a year's output between April and September.

What a 4.4 kWp system is worth here

On a south-facing roof, a 4.4 kWp system (10 panels of 440 W) costs about £6,917 at the calculator's midpoint and saves between £255 and £261 in its first year for a typical three-bedroom home on a 27p tariff (a rounded GB reference rate; use your own), with nothing assumed for exported power. That pays back in 22.4 to 22.8 years across these counties, with energy prices rising 3% a year.

On our calculator, with Great Britain's 12p export rate the same system would pay back in about 10.5 years in County Down and 11.3 years in County Antrim, instead of 22.4 and 22.8 years with no export income.

Installed cost by region

DESNZ's installed-cost data covers Great Britain only, so there is no regional figure for Northern Ireland. Our calculator uses the same national cost model here.

Summer and winter output

PVGIS's monthly profile, scaled to our reference, for a 4.4 kWp system.

CountyApril to SeptemberBest monthWeakest month
County Down70%May 546 kWhDec 113 kWh
County Antrim71%May 512 kWhDec 84 kWh

Where the yields come from

Yields: PVGIS v5.3 (European Commission, Joint Research Centre), scaled by us to the calculator's 950 kWh/kWp national reference. Radiation data: SARAH-3, copyright 2026 EUMETSAT (CM SAF), doi 10.5676/EUM_SAF_CM/SARAH/V003. Meteorological data: contains modified Copernicus Climate Change Service information 2026. Full credits and licence statements.

Export payments in Northern Ireland

The Smart Export Guarantee covers Great Britain only, so there's no guaranteed export tariff in Northern Ireland; any payment for exported power is at your supplier's discretion. The figures on this page assume none.

Connecting to the grid

Network operatorAreaCounties herekWh per kWp
NIE NetworksNorthern IrelandCounty Down, County Antrim837–917

Ask your installer or NIE Networks how the connection works for your system.

What support exists in Northern Ireland

The calculator assumes VAT relief only here: 0% VAT on solar panels and batteries until 31 March 2027, under VAT Notice 708/6 on GOV.UK. The Boiler Upgrade Scheme does not cover Northern Ireland, and there is no Smart Export Guarantee.

  • No Boiler Upgrade Scheme

    The Boiler Upgrade Scheme doesn't cover Northern Ireland, so the calculator's heat pump grant doesn't apply here.

    Confirm with: NI Direct for current Northern Ireland schemes.

  • Zero-rate VAT on solar panels, batteries and heat pumps: our zero-rate VAT guide has the dates and what it covers.

Scheme notes last checked 7 October 2026.

More on grants and export payments

Home energy grants: our guides.

Sources