We calculated the yield for 2 Northern Ireland counties with PVGIS, the European Commission's solar tool, and ran each through the calculator for a typical 4.4 kWp system.
| County | PVGIS, unscaled | Used (kWh/kWp) | 4.4 kWp makes | Payback |
|---|---|---|---|---|
| County Down | 944.7 | 917 | 4,035 kWh | 22.4 yrs |
| County Antrim | 862.3 | 837 | 3,683 kWh | 22.8 yrs |
How the counties compare
The sunniest Northern Ireland county we cover is County Down, at 917 kWh per kWp a year. The least sunny is County Antrim, at 837, so a system makes about 10% more in County Down. Against all 25 counties we cover, they rank from 17th to 23rd for sunshine. PVGIS puts 70% to 71% of a year's output between April and September.
What a 4.4 kWp system is worth here
On a south-facing roof, a 4.4 kWp system (10 panels of 440 W) costs about £6,917 at the calculator's midpoint and saves between £255 and £261 in its first year for a typical three-bedroom home on a 27p tariff (a rounded GB reference rate; use your own), with nothing assumed for exported power. That pays back in 22.4 to 22.8 years across these counties, with energy prices rising 3% a year.
On our calculator, with Great Britain's 12p export rate the same system would pay back in about 10.5 years in County Down and 11.3 years in County Antrim, instead of 22.4 and 22.8 years with no export income.
Installed cost by region
DESNZ's installed-cost data covers Great Britain only, so there is no regional figure for Northern Ireland. Our calculator uses the same national cost model here.
Summer and winter output
PVGIS's monthly profile, scaled to our reference, for a 4.4 kWp system.
| County | April to September | Best month | Weakest month |
|---|---|---|---|
| County Down | 70% | May 546 kWh | Dec 113 kWh |
| County Antrim | 71% | May 512 kWh | Dec 84 kWh |
Where the yields come from
Yields: PVGIS v5.3 (European Commission, Joint Research Centre), scaled by us to the calculator's 950 kWh/kWp national reference. Radiation data: SARAH-3, copyright 2026 EUMETSAT (CM SAF), doi 10.5676/EUM_SAF_CM/SARAH/V003. Meteorological data: contains modified Copernicus Climate Change Service information 2026. Full credits and licence statements.
Export payments in Northern Ireland
The Smart Export Guarantee covers Great Britain only, so there's no guaranteed export tariff in Northern Ireland; any payment for exported power is at your supplier's discretion. The figures on this page assume none.
Connecting to the grid
| Network operator | Area | Counties here | kWh per kWp |
|---|---|---|---|
| NIE Networks | Northern Ireland | County Down, County Antrim | 837–917 |
Ask your installer or NIE Networks how the connection works for your system.
What support exists in Northern Ireland
The calculator assumes VAT relief only here: 0% VAT on solar panels and batteries until 31 March 2027, under VAT Notice 708/6 on GOV.UK. The Boiler Upgrade Scheme does not cover Northern Ireland, and there is no Smart Export Guarantee.
No Boiler Upgrade Scheme
The Boiler Upgrade Scheme doesn't cover Northern Ireland, so the calculator's heat pump grant doesn't apply here.
Confirm with: NI Direct for current Northern Ireland schemes.
- Zero-rate VAT on solar panels, batteries and heat pumps: our zero-rate VAT guide has the dates and what it covers.
Scheme notes last checked 7 October 2026.
More on grants and export payments
Home energy grants: our guides.