- Sunlight on a south-facing panel
- 995 kWh/m²
- Yield (south-facing)
- 787 kWh/kWp
- 4.4 kWp system makes
- 3,463 kWh/yr
- Payback
- 11.8 years
Source: PVGIS 5.3 (European Commission) for Inverness: the sunlight figure is as PVGIS gives it, and the yield is scaled to our calculator's 950 kWh per kWp national reference. The system output and payback are from our calculator.
How much sun Highland gets
Highland has the least sunshine of the 25 counties we cover: PVGIS puts a south-facing panel at Inverness at 995 kWh of sunlight per square metre a year. Solar still generates here; it just takes longer to pay back.
On our calculator, a 4.4 kWp system here makes about 664 kWh a year less than in West Midlands (16% less).
Month by month in Highland
PVGIS at Inverness (35°, south), scaled to 3,463 kWh a year: 484 kWh in May, 61 kWh in December, and 73% of the year's output from April to September.
| Jan 80 kWh | Feb 164 kWh | Mar 298 kWh |
| Apr 422 kWh | May 484 kWh | Jun 458 kWh |
| Jul 458 kWh | Aug 398 kWh | Sep 318 kWh |
| Oct 213 kWh | Nov 112 kWh | Dec 61 kWh |
What a 4.4 kWp system is worth here
Our calculator puts it at about £6,917 installed, and £555 saved in year one on a 27p/kWh tariff, £304 of it from exports at 12p/kWh: about 11.8 years to pay back, with import prices rising 3% a year and the export rate flat.
What this means in Highland
On our calculator's reference assumptions, 3,463 kWh a year is about 9.5 kWh a day on average, from 61 kWh in December to 484 kWh in May. That saves £555 in year one (£251 from power you use at 27p/kWh, £304 from exports at 12p/kWh) against about £6,917 installed, so the system pays for itself in about 11.8 years. That assumes about 27% of the 3,463 kWh is used in the home, and the rest is exported.
Electricity and installation prices in Highland
Octopus's Northern Scotland region, which includes Highland: Flexible Octopus 26.35p per kWh (direct debit, inc VAT, read 25 November 2026). Not used in the payback, which assumes 27p.
DESNZ's 4 to 10 kW installed-cost data for 2025/26 puts the mean at £1,578 per kW in Scotland. The calculator uses national medians, not regional means.
Connecting to the grid in Highland
Your network operator is Scottish and Southern Electricity Networks (North of Scotland). Ask your installer or Scottish and Southern Electricity Networks how the connection works for your system.
Grants, export payments and VAT
Scotland's schemes: SEG, 0% VAT, grants, MCS and G98 and G99 for battery add-ons.
Closest in sunshine
| Greater Manchester | 860 kWh/kWp | 11-year payback |
| County Antrim | 837 kWh/kWp | 22.8-year payback |
| Glasgow | 828 kWh/kWp | 11.3-year payback |
All Scotland counties, and what differs there
Across Highland
PVGIS was also run at 2 other points near Inverness (distances in the names; points may fall outside Highland), scaled like Inverness's 787 kWh per kWp.
| Point | kWh per kWp a year | Against Inverness |
|---|---|---|
| 25 km east of Inverness | 819 | +4.1% |
| 25 km west of Inverness | 801 | +1.8% |
Where these numbers come from
PVGIS was run at Inverness for a 1 kWp system facing south at 35°, and its figure is used for Highland.
| PVGIS at Inverness, unscaled | 810.5 kWh/kWp |
|---|---|
| Scale factor (950 ÷ 978.4) | × 0.971 |
| Yield used on this page | 787 kWh/kWp |
Yields: PVGIS v5.3 (European Commission, Joint Research Centre), scaled by us to the calculator's 950 kWh/kWp national reference. Radiation data: SARAH-3, copyright 2026 EUMETSAT (CM SAF), doi 10.5676/EUM_SAF_CM/SARAH/V003. Reference: Pfeifroth, U., Drücke, J., Kothe, S., Trentmann, J., Schröder, M. and Hollmann, R. (2024). “SARAH-3 – satellite-based climate data records of surface solar radiation”. Earth System Science Data, 16(11). doi 10.5194/essd-16-5243-2024. Meteorological data: contains modified Copernicus Climate Change Service information 2026. Full credits and licence statements.
- Highland is a large, varied region and this figure is calculated for Inverness specifically — sunshine elsewhere in the region may differ. We also ran 25 km west of Inverness (1.8% higher) and 25 km east of Inverness (4.1% higher).